1

Start of the brick facing. The brick will be later covered with stone/stucco. | 2

Ferris mixing mortar for the brick work. | 3

Brick work progressing. | 4

Facing is complete. The main fire box door is installed. | 5

Laying out the heated bench. Flue gases move through the bench to heat it up. |
6

Bench fire bricks are mortared in place. | 7

Tricky connection of the bench with the chimney. | 8

Bench top is placed. | 9

Chimney damper is mortared in place. | 10

Mary Lou is testing out the bench. |
11

Stone top for the bench is installed. | 12

Udo is laying out the stones for the heater front. | 13

Stones are being mortared in place. | 14

Stucco time! | 15

More stucco work. |
16

Close up of fiberglass mesh embedded in the stucco. | 17

Finished bench (back of the heater). | 18

Udo is putting on the final bit of stucco on the front of the heater. |