1

Base of the heater. It is important to get it in the correct spot! | 2

Base side channels are in place and Udo (on the left) is working on the connecting rear channel. | 3

Connecting channel is complete. Notice the chimney connection hole. | 4

Vidas, Udo and Norbert install the fire box floor. | 5

The firebox is being started. Also, the water loop is in place. |
6

The firebox is coming along. Notice the firebox is composed of an inner and
outer part. In this picture only one layer of the inner firebox is complete. | 7

The firebox lintel is in place. Also the right middle side channel is installed. | 8

The heater gets higher. | 9

The base of the bake oven is in place. | 10

The bake oven is complete. |
11

All the side channels are set. | 12

View of the top and back of the bake oven. | 13

The fiberglass matt is attached. This acts as a slip joint so that the core can move up and down (due to the high temperatures) without cracking the facing. | 14

The finished front face of the heater core. | 15

The finished rear side of the heater core. |
16

The finished side of the heater core. Notice the bypass - used to help the draft during startup. |